Yurakucho District Tunnel Development Project (Tentative name) Nakadori Tunnel Construction
Previously, the Yurakucho area had a district heating and cooling system that connected the buildings together, but to further improve environmental performance, business continuity in the event of a disaster, and to ensure continued power supply when buildings are rebuilt in the future, a new tunnel was constructed underground under Marunouchi Nakadori Street.
In order to pass under the Tokyo Metro Yurakucho Line, a steep shield tunnel with a maximum depth of approximately 33m and a maximum gradient of approximately 20% is planned. The construction of this tunnel will form a new district heating and cooling network, contributing to improving the local environment and disaster prevention capabilities.
DATA
Year of completion | 2020 |
---|---|
location | Chiyoda ward, Tokyo |
Applications | district heating and cooling facilities |
structure | Shield Tunnel |
Our Business | Civil architectural design and construction supervision |
scale | 洞道内径:φ3,200 |
Update : 2021.12.04