Tosu Premium Outlet Skywalk
This overhead walkway was planned between the bus stop and the store site to resolve the problem of road crossings, which had been a concern for facility operation from the perspective of easing congestion and ensuring the safety of visitors. The bridge abutments make use of the terrain to keep the bridge section to a minimum, and a simple and economical plate girder format was made possible, which allowed for a short construction period of just under one year from the start of design to completion, at low cost, while also harmonizing with the existing store design through the use of decorative panels, sprayed stone finish, and balustrades.
DATA
Year of completion | 2019 |
---|---|
location | Tosu City, Saga Prefecture |
Applications | Roads and Bridges |
structure | Superstructure: Simple non-composite plate girder bridge Substructure: RC abutment (parking lot side) / RC abutment with stairs (store side) |
Our Business | Civil architectural design and construction supervision |
full length | Approximately 33m (including bridge section approximately 18m) |
Width | 3.5m |
Related Links | Tosu Premium Outlet |
Update : 2024.05.27